• /  11
  • 下載費用: 14.9積分  

工程經濟——論述

'工程經濟——論述'
?工程經濟一一論述1. discuss the advantages of adopting the manufacturing cost method?Manufacturing cost method is the direct material cost, will have close relationship with the production of direct labor and inanufacturing costs ineluded in the cost of the product, and there is no direct contact with the production of administrative expenses and financial expenses and selling expenses deducted directly from the current income?Helps to simplify cost accounting? This is because in the inanufacturing cost method, the cost of enterprise management is directly ineluded in the current profits and losses, not in distribution, simplifying the cost accounting?Helps to improve the accuracy of cost calculation. In the full cost method, because the income is directly related to the size and administrative expenses and financial expenses and product distribution, can not guarantee the rationality of the standard of distribution, and the manufacturing cost method does not exist in the cost allocation unreasonable phenomenon, so as to improve the accuracy of cost accounting.Contribute to correctly calculate the cost responsibility of enterprise production unit? This is because the product cost calculated by the manufacturing cost method actually refers to the cost of the workshop product? It accurately reflects the cost of the workshop, the quality of the water, and the responsibility for assessing the cost of the workshop?Contribute to cost forecasting and decision making. This is bec-省略部分-ethods of calculating incremental and incremental costsThere are two ways to calculate incremental and incremental costs: "before and after comparison,/ and "if there is no comparison. 〃“.The comparison method is to compare the relevant data of the former and the latter, and calculate the difference, so as to evaluate the economic benefit of the technical transformation project?Is there a comparative method to compare the income and expenses in the case of "yes" and 〃no〃 technological transformation, and the difference is calculated to evaluate the economic benefits of the technical transformation project?Before and after the comparison itself is 〃two scheme" and "the transformation/,, after the transformation scheme of thecalculated value is to predict the future several times, before the transformation scheme is past or present at a specific point in time in the stationary state? The two are not comparable in time?(dynamic results are better than static results)The law of comparison is that the two program (transformation or non transformation) is based on the same time comparison, that is to say, to predict and predict the future conditions of transformation and non transformation, and then compare them. This is in line with the comparative principle of Engineering econom y.(dynamic results are better than dynamic results)Therefore, only if the assumption is not changed and the status quo remains unchanged, the conclusions of the two methods are consistent?
關 鍵 詞:
經濟 論述 工程
 天天文庫所有資源均是用戶自行上傳分享,僅供網友學習交流,未經上傳用戶書面授權,請勿作他用。
關于本文
本文標題:工程經濟——論述
鏈接地址: http://www.476824.live/p-47706419.html
關于我們 - 網站聲明 - 網站地圖 - 資源地圖 - 友情鏈接 - 網站客服點擊這里,給天天文庫發消息,QQ:1290478887 - 聯系我們

本站為“文檔C2C交易模式”,即用戶上傳的文檔直接賣給(下載)用戶,本站只是中間服務平臺,本站所有文檔下載所得的收益歸上傳人(含作者)所有【成交的100%(原創)】。本站是網絡服務平臺方,若您的權利被侵害,侵權客服QQ:1290478887 歡迎舉報。

[email protected] 2017-2027 http://www.476824.live 網站版權所有

粵ICP備19057495號 

收起
展開
球探网即时蓝球比分 湖南快乐十分任选5遗漏 贵州十一选五号码推荐 河南11选5基本走势图 100期货配资 青海快三开奖走势图 七星开奖结果彩 什么是股票融资 云南十一选五分布走势图一定牛 快乐十分中奖规则图 辽宁35选7中奖规责